
A Hull City Council Decision Record published today has authorised the tender of a contractor to carry out repair work to Lockwood Street Bridge.
The bridge, which spans the Beverley and Barmston Drain and connects Lockwood Street to Barmston Street in west Hull, sustained damage when it was struck by a vehicle in November 2025.
The collision damaged the southern cast iron parapet of the bridge, which is currently being supported by temporary scaffolding to ensure safety.
The appointed contractor will be responsible for repairing damage to the masonry on the north and south elevations and replacing the damaged cast-iron parapet on the south.
The cast-iron elements will be carefully recast and installed using traditional techniques to preserve the bridges historic character.
Constructed in 1877, the structure is Grade II listed. All repair works will therefore be completed in accordance with the Listed Building Consent, ensuring its historic and architectural significance is protected.
Councillor Mark Ieronimo, cabinet portfolio holder for infrastructure and transport at Hull City Council said: “Lockwood Street Bridge is an important part of Hull’s transport infrastructure, helping to keep the west of the city moving.
“As a Grade II listed structure, it also has historical significance. These repairs will not only repair the damage caused by the collision but preserve the bridge’s Victorian features for future generations to come.
“We’re looking forward to working with the appointed contractor to carefully repair the bridge, protect its heritage and preserve this key transport link, so it can continue to serve residents for years to come.”
Since the bridge was struck by a vehicle last year, Mason Clark Associates, on behalf of the council, has carried out all required environmental and 3D scanning surveys, secured Listed Building Consent and an Environment Agency permit and engaged a specialist cast-iron contractor to design the repairs.
This scheme is part of the council’s long-term infrastructure programme, developed to bring together proactive and reactive maintenance to preserve Hull’s vital assets.
For more information, visit Infrastructure maintenance programme | Bridges and structures | Hull