Here is the latest breakdown of scheduled and emergency works taking place across Hull over the next few weeks. All works are subject to change. For the latest updates:
- Visit National Highways for more information on planned roadworks, or follow them on Twitter @HighwaysYORKS
- Follow @hullccnews on Twitter
- Follow the Hull City Council Facebook page
- Check one.network before travelling
A number of road closures are also in place for Hull Fair. For more information, visit Hull Fair: Full list of road closures – Hull CC News
A63 improvement scheme – St James Street to Market Place | 01-May-20 | 01-May-25 | Major A63 Improvement scheme – full infrastructure change. Lane and road closures until completion of scheme. | National Highways |
A63 – Market Place | 13-Sep-24 | 13-Oct-24 | Castle Street improvement scheme. Full closure of the Market Place entry slip road. Full diversion route will be in place. | National Highways |
Anlaby Park Road South | 23-Sep-24 | 15-Nov-24 | Carriageway resurfacing from Tilbury Road to number 174. Road closure in place. | Hull City Council |
Alfred Gelder Street | 14-Oct-24 | 15-Oct-24 | Replacing existing traffic signal assets. Predominantly footway works, but some carriageway incursion may occur. Two-way signals in place. | Hull City Council |
Chanterlands Avenue | 15-Oct-24 | 25-Oct-24 | Dig road crossing between 193 and 154 Chanterlands Avenue. Multi-way signals in place. | Grain |
Ellerburn Avenue | 30-Sep-24 | 07-Oct-24 | Concrete repairs to existing bays between 175 and 183 Ellerburn Avenue. Road closure. | Hull City Council |
East Carr Road | 14-Oct-24 | 25-Oct-24 | Install new electric cable to supply new development site opposite 33 to 23 East Carr Road. Two-way signals in place. | Utility Distribution Networks Limited |
East Carr Road | 14-Oct-24 | 25-Oct-24 | Install new main to supply new development site opposite 33 to 23 East Carr Road. Two-way signals in place. | Energy Assets Pipelines Limited |
Fountain Road | 02-Sep-24 | 11-Oct-24 | Gas main replacement at the junction of Main Street. Multi-way signals in place. | Northern Gas Networks |
Hotham Road South | 23-Sep-24 | 20-Dec-24 | Manhole construction. Road closure in place. | Yorkshire Water |
James Reckitt Avenue | 30-Sep-24 | 11-Oct-24 | Asset replacement between 200 and 217 James Reckitt Avenue. Multi-way signals in place. | Northern Gas Networks |
Lowgate | 09-Sep-24 | 31-Oct-24 | New mains cable installation from the church to the junction of Scale Lane. Two-way signals in place. | Northern Powergrid |
Main Street | 02-Sep-24 | 11-Oct-24 | Asset replacement at the junction of Main Street to Fountain Road. Multi-way signals in place. | Northern Gas Networks |
Market Place | 16-Sep-24 | 11-Oct-24 | Installation of a new mains cable from the court to Liberty Lane. Multi-way signals in place. | Northern Powergrid |
Orchard Park Road | 04-Oct-24 | 10-Oct-24 | Emergency road closure to repair burst water main. Access will be maintained to the health centre. | Yorkshire Water |
Pearson Park | 30-Sep-24 | 09-Nov-24 | Footway reconstruction and speed hump installation. Footpath and road closures. | Hull City Council |
Scale Lane | 01-Oct-24 | 31-Oct-24 | Road closure in conjunction with works on Lowgate. | Northern Powergrid |
Saltshouse Road | 07-Oct-24 | 11-Oct-24 | Carriageway resurfacing from the junction of Robson Way/Saltshouse Road to High Tree Mount, near Church Street. Road closure in place. | Hull City Council |
St Lukes Street | 07-Oct-24 | 11-Oct-24 | Excavate temp reinstatement at the junction of Osbourne Street and Porter Street. Multi-way signals in place. | Connexin |
Spring Bank West | 15-Oct-24 | 18-Oct-24 | Level crossing maintenance works at the junction with Walton Street. Road closure. 10pm to 6am only. | Network Rail |
Terry Street | 08-Oct-24 | 09-Oct-24 | Telecoms maintenance next to KFC. Two-way signals in place. | O2 Limited |
Wincolmlee | 29-Sep-24 | 09-Oct-24 | Repair gas escape between Bankside Park and Air Street. Two-way signals in place. | Northern Gas Network |
Wyke Street | 14-Oct-24 | 01-Nov-24 | Asset replacement from Hedon Road to the junction of Raven Street. Multi-way signals in place. | Northern Gas Network |