| A63 improvement scheme -  St James Street to Market Place | 01 May 2020 | 01 May 2025 | Lane closures and local diversions until completion of scheme. LGV diversion signed via ERYC to limit number of LGVs in city centre. | National Highways | 
	| A63 improvement scheme - Commercial Road | 26 October 2021 | 30 April 2024 | Enable H&S and safe systems of works for operatives working on the scheme. | National Highways | 
	| Beverley Road - Brunswick Arcade | 04 October 2021 | 01 April 2023 | Brunswick Arcade demolition. Lane closures | HCC - MP&I | 
	| Beverley Road | 11 July 2022 | 29 July 2022 | Inglemire Lane junction improvement scheme. | HCC & MP&I | 
	| Beverley Road | 25 July 2022 | 05 August 2022 | Gas main connection. Multi-way signals. Works to take place between 9.30am and 3.30pm weekdays only. Atll other times the juction will run as normal using temporary signals. | Northern Gas Networks | 
	| Beverley Road | 01 August 2022 | 19 August 2022 | LEP junction improvement scheme. Junction of Clough Road. Lane closure. outbound. Four-way signals from 7.30pm to 11pm Monday to Friday for second and third weeks. | HCC | 
	| Chamberlain Road | 02 August 2022 | 04 August 2022 | Replacment of toucan crossing traffic signals at Hornsea  cycle track. Two-way temporary signals. | StreetScene - Traffic Signals | 
	| Hall Road | 01 September 2022 | 01 September 2022 | Major, non-excavation works. Road Closure. Activities to take place 10am to 3.30pm. Highway to be clear at all other times. | T-mobile | 
	| Hawthorn Avenue | 16 August 2022 | 19 August 2022 | Level crossing and track survey. Lane closure with two-way signals from 11pm - 5.30am. | Network Rail | 
	| Hessle Road (12-month Scheme) | 23 August 2021 | 04 September 2022 | Footway reconstruction. | HCC - MP&I | 
	| High Street | 16 May 2022 | 30 July 2022 | Laying ducting, kerbs/ edgings, installation of cobbled paving  under Myton Bridge. Multi-way signals. | National Highways | 
	| High Street | 30 July 2022 | 30 July 2022 | Hull Festival of Archaeology. Closure of High Street. Local diversion in place in conjuction with Pride Event. | HCC | 
	| Holderness Road (Victor St to Southcoates) (PHASES 1-8) | 04 January 2022 | 11 September 2022 | Full footway reconstruction scheme. | MP&I - Highways Strategy & Design | 
	| Holderness Road | 13 June 2020 | 29 July 2022 | Gas mains replacement work. From junction of Franklin Street to opposite junction of Williamson Street. Lane closure in carriageway. Footway closed (a walkway will be available). Access/egress to all junctions. Traffic Management to be removed as works progress along Holderness Road. All works areas to be a maximum of 100m. | East Riding DSP Replacement/ Northern Gas Networks | 
	| Holderness Road | 25 July 2022 | 29 July 2022 | Install telecoms chamber. Lane closure. Works/TM will take place between 09:30-15:30 weekdays. All other times highway to be clear.  Inside Eastbound Lane closed between jct Shannon Road & Ganstead Lane. Outside Eastbound Lane maintained for vehicles at all times | Connexin Limited | 
	| Naylor's Row | 25 July 2022 | 19 August 2022 | Gas mains replacement.  Cycle lane closure - traffic flow not affected. | Northern Gas Netowrk | 
	| Perth Street West | 25 July 2022 | 05 August 2022 | Renew cable. Two-way signals to be manned during working hours (8am - 6pm). | NPG | 
	| Priory Way | 01 April 2022 | 31 March 2023 | Major improvement scheme. | HCC - MP&I | 
	| Robson Way | 22 September 2022 | 28 September 2022 | Install 5G cabinet. Road Closure. Approximately 40m from the junction with Wawne Road. Local diversion in place. | T-mobile | 
	| Saltshouse Road | 25 July 2022 | 26 August 2022 | Replace gas main. Temporary two-way signals outside Coniston Lodge lights to be manually controlled during works (7.30am to 6pm Mon to Fri;  8am to 3pm Sat/Sun). | East Riding DSP Replacement | 
	| Stoneferry Rd Scheme - Woodhall Street to Lorraine Street | 01 April 2021 | 01 September 2022 | Major Improvement Scheme commissioned by HCC  - Infrastructure improvements and road widening. Lane closures throughout the scheme. Signals works at Woodhall Street junction are now completed. | HCC - MP&I  / Colas | 
	| Stoneferry Rd Scheme - Chamberlain Road to Bandstand Roundabout | 23 April 2021 | 01 September 2022 | Major improvement scheme commissioned by HCC  - Infrastructure improvements and road widening. Lane closures throughout the scheme. Signals works at Woodhall Street junction are now completed. | HCC - MP&I  / Colas | 
	| Stoneferry Rd Scheme - Leads Road | 25 April 2022 | 29 July 2022 | Renew footpaths and kerbs. Leads Road closed westbound between Rotterdam Road and Bandstand Roundabout during works. | HCC - MP&I  COLAS | 
	| Stoneferry Rd Scheme - Sutton Road | 03 May 2022 | 12 August 2022 | Reconstruction of the new junction under temporary traffic lights to enable removal of the existing permanent traffic signals. Multi-way signals to run in phases to help minimise disruption. Leads Road / Sutton Road junction. | HCC - MP&I  / Colas | 
	| Stoneferry Rd Scheme - Holwell Road/Stoneferry Road | 27 July 2022 | 28 July 2022 | Carriageway resurfacing. Stoneferry Road (southbound) closed overnight (7pm - 6am)  from Bandstand Roundabout to Ferry Lane Roundabout. Lane closure on Holwell Road approach to Bandstand Roundabout. | HCC - MP&I  / Colas | 
	| Stoneferry Rd Scheme - Leads Road / Sutton Road junction | 28 July 2022 | 03 August 2022 | Carriageway resurfacing. Overnight closure of northern section of junction. Works to take place Mon-Fri  between 7pm - 6am. Sutton Road to remain open under two-way signals. | HCC - MP&I  / Colas | 
	| Stoneferry Rd Scheme - Leads Road / Sutton Road junction | 03 August 2022 | 09 August 2022 | Carriageway resurfacing. Overnight road closures on southern section of junction. Works to take place Mon-Fri between 7pm - 6am. Sutton Road to remain open under two-way signals. | HCC - MP&I  / Colas | 
	| Stoneferry Rd Scheme - Leads Road / Sutton Road junction | 09 August 2022 | 10 August 2022 | Carriageway resurfacing. Overnight closure (7pm-6am) of whole junction. Sutton Road to remain open under two-way signals. | HCC - MP&I  / Colas | 
	| Stoneferry Rd Scheme - Leads Road / Sutton Road junction | 10 August 2022 | 11 August 2022 | Carriageway resurfacing. Overnight closure (7pm - 6am) of northern section of junction. Sutton Road to remain open under two-way signals. | HCC - MP&I  / Colas | 
	| Stoneferry Rd Scheme - Leads Road / Sutton Road junction | 11 August 2022 | 13 August 2022 | Carriageway resurfacing. Overnight closure of southern section of junction. Works to take place weeknights between 7pm - 6am. Sutton Road to remain open under two-way signals. | HCC - MP&I  / Colas | 
	| Stoneferry Rd Scheme - Leads Road | 13 August 2022 | 14 August 2022 | Carriageway resurfacing. Full weekend closure of Leads Road between Bandstand Roundabout & Rotterdam Road. Closure will start at 7am Saturday and will be removed by midnight on Sunday. | HCC - MP&I  / Colas | 
	| Sutton Road | 22 August 2022 | 25 August 2022 | Replacement of toucan crossing traffic signals. Temporary two-way signals between Leads Road junction and Holwell Roundabout. | StreetScene - Traffic Signals | 
	| Thomas Street | 11 July 2022 | 25 July 2022 | Gas mains replacement. Road closure no longer required. | Northern Gas Netowrk | 
	| Wilberforce Drive | 30 July 2022 | 30 July 2022 | Pride Event. Full closure of Wilberforce Drive, Guildhall Road & Queens Dock Avenue. Short-duration closures of Alfred Gelder Street, Lowgate, Bond Street and George Street during parade. Local diversion in place. | Hull Pride | 
	| Worship Street | 11 July 2022 | 05 July 2023 | Conversion of former Central Fire Station. No access to/from Freetown Way. Local diversion in place. | esteem |