This week, it was announced that overnight resurfacing works would be taking place in Chamberlain Road and Stoneferry Road from Monday 6 December in the latest phase of the Stoneferry improvement scheme.
The work, which is expected to last about a week, will be carried out from 7pm to 6am, Monday to Friday (including Saturday morning).
During the work, the Chamberlain/Stoneferry roundabout and part of Chamberlain Road will be closed.
Councillor Dean Kirk, portfolio holder for transportation, roads and highways said: “With the Stoneferry improvement scheme, we are improving access and use for thousands of residents and businesses in the area. We apologise for any inconvenience caused.”
A breakdown of planned works taking place across Hull has been detailed below:
Location | Start Date | Due Date | Reason | Utility/HCC Name |
A63 improvement scheme – Porter Street Bridge | 29/11/21 | 3/12/21 | Porter Street Bridge works. Overnight closures 8pm – 6am. A63 eastbound from Brighton Street to Roger Millward Way. A63 westbound from Roger Millward Way to Daltry Street. | National Highways |
A63 improvement scheme – Commercial Road | 26/10/21 | 30/4/22 | Enable H&S and safe systems of works for operatives working on the scheme | National Highways |
A63 improvement scheme – St James Street to Market place | 1/5/20 | 1/5/25 | Lane closures and local diversions until completion of scheme. LGV diversion signed via ERYC to limit number of LGVs in city centre. | National Highways |
Anlaby Road | 30/11/21 | 30/11/21 | Removal of artwork to pedestrian crossing near junction of Coltman Street. Contraflow from 7pm to 11pm. | MP&I |
Argyle Street | 12/12/21 | 12/12/21 | Disconnect water supply. Footpath closure with walkway in carriageway at exit from NHS car park | Yorkshire Water |
Barham Road | 29/11/21 | 23/1/22 | Carriageway Resurfacing and concrete repairs | HCC – MP&I |
Beverley Road cycle scheme | 23/8/21 | 3/12/21 | Implementation of cycle scheme. Queens Road/ Beverley Road and Cottingham Rd/Clough Road junctions. | HCC – MP&I |
Beverley Road cycle scheme | 14/10/21 | 17/12/21 | Construction of off-line cycle track. Hall Road to City Boundary outbound. Lane closure throughout duration of works. | HCC – MP&I |
Beverley Road cycle scheme | 22/10/21 | 3/12/21 | Implementation of cycle scheme. Mizzen road to Hall Road Inbound. 9.30am to 3.30pm lane closures | HCC – MP&I |
Beverley Road – Brunswick Arcade | 4/10/21 | 1/9/22 | Brunswick Arcade demolition. Contraflow in place until April 2022. Lane closure in place until Sept 2022 | HCC – MP&I |
Beverley Road | 8/12/21 | 9/12/21 | Slot cutting. Beverley Road outbound between Mizzen Road and Hall Road. Lane closure 9.30am to 3.30pm | StreetScene – Traffic Signals |
Beverley Road | 9/12/21 | 10/12/21 | Slot cutting. Beverley Road inbound to Mizzen Road. Lane closure 9.30am to 3.30pm | StreetScene – Traffic Signals |
Bowlalley Lane | 18/10/21 | 17/12/21 | Footway Scheme. Extended to include carriageway. Road closure | HCC – MP&I |
Hall Road | 10/12/21 | 10/12/21 | Slot cutting. Multi-way lights on junction with Inglemire Lane. Works between 9.30am and noon | StreetScene – Traffic Signals |
Hessle Road (12-month Scheme) | 23/8/21 | 4/9/22 | Footway reconstruction | HCC – MP&I |
Holderness Road | 6/12/21 | 6/12/21 | Slot cutting for traffic signal loops. Signals on junction of Holderness Road and Southcoates Lane. Works to take place between 9.30am and 3.30pm | StreetScene – Traffic Signals |
Holderness Road (Victor St to Southcoates) (PHASES 1-8) | 27/9/21 | 1/11/22 | Full footway reconstruction scheme. | HCC – MP&I |
Holderness Road | 21/12/21 | 23/12/21 | Lane closure for work to existing telecoms site in the central verge near Summergangs Lane. | T-Mobile Ltd |
Holderness Road to Ganstead Roundabout | 29/11/21 | 1/12/21 | Essential works to install communications pole. Four-way signals to be a place during pole lift from 6.30pm to 11.30pm. Carriageway will be clear at all other times. | T – Mobile |
Lowgate Footway Scheme – Lowgate | 1/11/21 | 10/1/22 | Footway repair scheme. Closed northbound from A63 to North Church Side. A63 slip road closed. Lane open southbound from Alfred Gelder Street to A63. | HCC – MP&I |
Lowgate Footway Scheme – Market Place | 22/10/21 | 22/12/21 | Footway repair scheme. East footway – no carriageway incursion. Except on occasions, parking bays removed to provide walkway | HCC – MP&I |
Midmere Ave | 22/11/21 | 30/11/21 | Carriageway repair works. Multi-way signals at junction with Dorchester Road/Midmere Ave. Work to take two hours only between these dates. | Streetscene – Highway Ops |
Saltshouse Road | 1/11/21 | 12/1/22 | Installation of two new pedestrian refuge islands between Dunvegan Road and Clear View Close | HCC-MP&I |
Spring Bank West | 25/10/21 | 18/12/21 | Upgrading network. Opposite Albert Ave to Tile Giant (footway, carriageway) | HCC – Streetscene Signals |
Stoneferry Rd Scheme – Woodhall Street to Lorraine Avenue | 1/4/21 | 28/5/22 | Major Improvement Scheme commissioned by HCC – Infrastructure improvements and road widening. Lane closures throughout the scheme. Signals works at Woodhall street junction are now completed | HCC – MP&I |
Stoneferry Rd Scheme – Chamberlain Road to Bandstand roundabout | 23/4/21 | 25/6/22 | Major improvement scheme commissioned by HCC – Infrastructure improvements and road widening. Lane closures throughout the scheme. Signals works at Woodhall street junction are now completed | HCC – MP&I COLAS |
Stoneferry Rd Scheme – Ferry Lane roundabout to Bandstand roundabout. | 9/11/21 | 17/11/21 | Road surfacing. Stoneferry Road – northbound only between Ferry Lane roundabout and Bandstand roundabout. Weeknight closures 7pm-6am | HCC – MP&I COLAS |
Stoneferry Rd Scheme – Bandstand roundabout | 26/11/21 | 29/11/21 | Roundabout closed for road surfacing and repair work from 7pm Friday to 6am Monday. Foredyke Avenue to be two-way with restricted parking. | HCC – MP&I COLAS |
Stoneferry Rd Scheme – Bandstand roundabout | 3/12/21 | 6/12/21 | Roundabout closed for road surfacing work from 7pm Friday to 6am Monday. Foredyke Avenue to be two-way with restricted parking. | HCC – MP&I COLAS |
Stoneferry Rd Scheme – Sutton Road | 24/11/21 | 3/12/21 | Resurfacing to Sutton Road. Sutton Road closed in both directions between Ennerdale / Stockholm Road roundabout and Holwell Road roundabout. Overnight works 7pm-6am on Nov 24-25 and Nov 29-Dec 2. | HCC – MP&I COLAS |
Stoneferry Rd Scheme – Chamberlain Road | 6/12/21 | 11/12/21 | Resurfacing to Chamberlain Road and roundabout. Closure of Chamberlain Road roundabout on Stoneferry Road and along Chamberlain Road to opposite No 194. Access to/from Lorraine Street will be maintained by marshalling. Works to take place overnight. | HCC – MP&I COLAS |
Wincolmlee (Phase 1) | 13/12/21 | 17/1/22 | Essential work to upgrade power supply. Multi-way signals, to be manned during traffic-sensitive times. All traffic management to be removed during Christmas closedown. | Northern Power Grid |