Roadworks signs
Keep up-to-date on the roadworks across the city.

Myton Bridge closure plus weekly traffic and travel update – 14 July

Here is the latest breakdown of scheduled and emergency works taking place across Hull over the next few weeks. All works are subject to change. For the latest updates:

LocationStart dateDue dateSummary of worksUtility/HCC
A63 Myton Bridge (Full weekend closure)14-Jul-2317-Jul-23Overnight closures for the refurbishment of Myton Swing Bridge. Closure in place from 8pm Friday 14 July until 6am Monday 17 July.National Highways
A63 Myton Bridge (weekday closures)17-Jul-2321-Jul-23Overnight closures for the refurbishment of Myton Swing Bridge. Closure in place from 8pm Monday 17 July until 6am Friday 21 July.National Highways
A63 improvement scheme – St James Street to Market Place01-May-2001-May-25Lane and road closures until completion of scheme. National Highways
A63 improvement scheme – Commercial Road26-Oct-2130-Apr-24Enable H&S and safe systems of works for operatives working on the scheme. Road closure in place.National Highways
Annandale Road12-Jul-2325-Jul-23Telecoms pole installation. Stop and go signs in place from 9.30am to 3.30pm.Connexin
Beverley Road – Brunswick Arcade04-Oct-2101-Sep-23Brunswick Arcade demolition. Lane closures.Hull City Council (Major Projects)
Beverley Road03-Jul-2314-Jul-23Replace gas pipes. Lane closure in place until 3.30pm.Northern Gas Networks
Bishop Lane14-Jul-2318-Jul-23Installation of new water supply connection. Road closure (full length).Yorkshire Water
Boothferry Road31-Jul-2318-Aug-23Trial holes to the check the condition of Boothferry Footbridge tie road under the carriageway. Road closure will be in place from Boothferry Road at the junction with Anlaby Park Road North and Anlaby Park Road South between 9.30am and 4.30pm.Hull City Council (Bridges Team)
Cottingham Road13-Jul-2302-Aug-23Installation of telecoms duct crossing. Multiway signals in place from the junction of Hardy Street to the junction of Haworth Street between 9.30am and 3.30pm.
Grain Connect
Hotham Road South14-Jul-2314-Jul-23Telecom pole installation at the junction of Sawston Avenue. Multiway signals in place until 3.30pm.Hutchington 3g Ltd
Hawthorn Avenue14-Jul-2317-Jul-23Level crossing upgrade. Road closure in place.Network Rail
Holderness Road18-Jul-2331-Jul-23Telecoms pole Installation. Lane closure in place from 9.30am to 3.30pm.Connexin
Holderness Road24-Jul-2302-Aug-23Telecoms Pole Installation from Laburnum Avenue to the junction of Brindley Street. Lane closure in place from 9.30am to 3.30pm.MS3
Mount Pleasant17-Jul-2318-Jul-23Telecoms cabinet works at the junction with Holderness Road. Road closure in place from 8pm to 6am.
Vodafone
North Road14-Jul-2314-Jul-23Telecoms pole installation opposite Francis Askew Primary School. Two-way signals in place between 9:30am to 3:30pm only.Hutchington 3g Ltd
Priory Road24-July-2325-July-23Installing new telecoms chamber at the junction with Hotham Road South. Multi-way signals in place from 9.30am to 3.30pm.CityFibre
Queens Road Avenue12-Jul-2319-Jul-23Repair burst water main opposite the fountain. Multi-way signals in place.Yorkshire Water
Robson Way20-Jul-2321-Jul-23Telecoms mast for testing and maintenance works. Two-way signals in place from 8pm to 4am.Mobile Broadband Network Limited (MBNL)
Staveley Road12-Jun-2306-Aug-23Carriageway reconstruction between Greenwich Avenue and Barham Road. Road closure in place.Hull City Council (Major Projects)
Southcoates Lane29-Jun-2317-Jul-23Installation of telecoms duct crossing at the junction of Brindley Street. Multiway signals in place between 9.30am and 3.30pm.Grain Connect
Stanley Street13-Jul-2315-Jul-23Plane and resurface existing carriageway at the junction with Morton Street. Road closure in place.Hull City Council
Sculcoates Lane18-Jul-2319-Jul-23Renew, cover and frame. Two-way signals in place from 7pm to 6am.Yorkshire Water
Swann Street21-Jul-2321-Jul-23Investigative works to detect and rectify fault at the junction of Lincoln Street. Multiway signals in place.Hutchington 3g Ltd
Selby Street23-Jul-2324-Jul-23Enabling works so the Walliker Street footbridge can be removed the following weekend. Two-way signals in place from 10pm to 8am.Hull City Council (Bridges Team)
Selby Street29-Jul-2330-Jul-23The removal of Walliker Street footbridge. Works located either side of the footbridge. Road closure in place.Hull City Council (Bridges Team)
Tower Street06-Jul-2318-Jul-23New service installation at junction with Citadel Way. Two-way signals in place from 9.30am to 3.30pm.Mua Electricity Limited
Wingfield Road22-May-2320-Aug-23Carriageway reconstruction, concrete repairs/reconstruction. Rolling closure of whole street, access maintained for residents.Hull City Council (Major Projects)
Worship Street11-Jul-2226-Jul-23Conversion of former Central Fire Station. Road closures in place throughout works.esteem
Members of Hull's BAME community mark Refugee Week with a football tournament
James Reckitt Ave