Here is the latest breakdown of scheduled and emergency works taking place across Hull over the next few weeks. All works are subject to change. For the latest updates:
- Visit National Highways for more information on the Myton Bridge closure and planned roadworks, or follow them on Twitter @HighwaysYORKS
- Follow @hullccnews on Twitter
- Follow the Hull City Council Facebook page
- Check one.network before travelling.
A63 Myton Bridge (Full weekend closure) | 14-Jul-23 | 17-Jul-23 | Overnight closures for the refurbishment of Myton Swing Bridge. Closure in place from 8pm Friday 14 July until 6am Monday 17 July. | National Highways |
A63 Myton Bridge (weekday closures) | 17-Jul-23 | 21-Jul-23 | Overnight closures for the refurbishment of Myton Swing Bridge. Closure in place from 8pm Monday 17 July until 6am Friday 21 July. | National Highways |
A63 improvement scheme – St James Street to Market Place | 01-May-20 | 01-May-25 | Lane and road closures until completion of scheme. | National Highways |
A63 improvement scheme – Commercial Road | 26-Oct-21 | 30-Apr-24 | Enable H&S and safe systems of works for operatives working on the scheme. Road closure in place. | National Highways |
Annandale Road | 12-Jul-23 | 25-Jul-23 | Telecoms pole installation. Stop and go signs in place from 9.30am to 3.30pm. | Connexin |
Beverley Road – Brunswick Arcade | 04-Oct-21 | 01-Sep-23 | Brunswick Arcade demolition. Lane closures. | Hull City Council (Major Projects) |
Beverley Road | 03-Jul-23 | 14-Jul-23 | Replace gas pipes. Lane closure in place until 3.30pm. | Northern Gas Networks |
Bishop Lane | 14-Jul-23 | 18-Jul-23 | Installation of new water supply connection. Road closure (full length). | Yorkshire Water |
Boothferry Road | 31-Jul-23 | 18-Aug-23 | Trial holes to the check the condition of Boothferry Footbridge tie road under the carriageway. Road closure will be in place from Boothferry Road at the junction with Anlaby Park Road North and Anlaby Park Road South between 9.30am and 4.30pm. | Hull City Council (Bridges Team) |
Cottingham Road | 13-Jul-23 | 02-Aug-23 | Installation of telecoms duct crossing. Multiway signals in place from the junction of Hardy Street to the junction of Haworth Street between 9.30am and 3.30pm. | Grain Connect |
Hotham Road South | 14-Jul-23 | 14-Jul-23 | Telecom pole installation at the junction of Sawston Avenue. Multiway signals in place until 3.30pm. | Hutchington 3g Ltd |
Hawthorn Avenue | 14-Jul-23 | 17-Jul-23 | Level crossing upgrade. Road closure in place. | Network Rail |
Holderness Road | 18-Jul-23 | 31-Jul-23 | Telecoms pole Installation. Lane closure in place from 9.30am to 3.30pm. | Connexin |
Holderness Road | 24-Jul-23 | 02-Aug-23 | Telecoms Pole Installation from Laburnum Avenue to the junction of Brindley Street. Lane closure in place from 9.30am to 3.30pm. | MS3 |
Mount Pleasant | 17-Jul-23 | 18-Jul-23 | Telecoms cabinet works at the junction with Holderness Road. Road closure in place from 8pm to 6am. | Vodafone |
North Road | 14-Jul-23 | 14-Jul-23 | Telecoms pole installation opposite Francis Askew Primary School. Two-way signals in place between 9:30am to 3:30pm only. | Hutchington 3g Ltd |
Priory Road | 24-July-23 | 25-July-23 | Installing new telecoms chamber at the junction with Hotham Road South. Multi-way signals in place from 9.30am to 3.30pm. | CityFibre |
Queens Road Avenue | 12-Jul-23 | 19-Jul-23 | Repair burst water main opposite the fountain. Multi-way signals in place. | Yorkshire Water |
Robson Way | 20-Jul-23 | 21-Jul-23 | Telecoms mast for testing and maintenance works. Two-way signals in place from 8pm to 4am. | Mobile Broadband Network Limited (MBNL) |
Staveley Road | 12-Jun-23 | 06-Aug-23 | Carriageway reconstruction between Greenwich Avenue and Barham Road. Road closure in place. | Hull City Council (Major Projects) |
Southcoates Lane | 29-Jun-23 | 17-Jul-23 | Installation of telecoms duct crossing at the junction of Brindley Street. Multiway signals in place between 9.30am and 3.30pm. | Grain Connect |
Stanley Street | 13-Jul-23 | 15-Jul-23 | Plane and resurface existing carriageway at the junction with Morton Street. Road closure in place. | Hull City Council |
Sculcoates Lane | 18-Jul-23 | 19-Jul-23 | Renew, cover and frame. Two-way signals in place from 7pm to 6am. | Yorkshire Water |
Swann Street | 21-Jul-23 | 21-Jul-23 | Investigative works to detect and rectify fault at the junction of Lincoln Street. Multiway signals in place. | Hutchington 3g Ltd |
Selby Street | 23-Jul-23 | 24-Jul-23 | Enabling works so the Walliker Street footbridge can be removed the following weekend. Two-way signals in place from 10pm to 8am. | Hull City Council (Bridges Team) |
Selby Street | 29-Jul-23 | 30-Jul-23 | The removal of Walliker Street footbridge. Works located either side of the footbridge. Road closure in place. | Hull City Council (Bridges Team) |
Tower Street | 06-Jul-23 | 18-Jul-23 | New service installation at junction with Citadel Way. Two-way signals in place from 9.30am to 3.30pm. | Mua Electricity Limited |
Wingfield Road | 22-May-23 | 20-Aug-23 | Carriageway reconstruction, concrete repairs/reconstruction. Rolling closure of whole street, access maintained for residents. | Hull City Council (Major Projects) |
Worship Street | 11-Jul-22 | 26-Jul-23 | Conversion of former Central Fire Station. Road closures in place throughout works. | esteem |