Here is the latest breakdown of scheduled and emergency works taking place across Hull over the next few weeks. All works are subject to change.
For the latest updates:
- Visit National Highways for more information on planned roadworks, or follow them on X (formerly Twitter) @HighwaysYORKS
- Follow @hullccnews on X (formerly Twitter)
- Follow the Hull City Council Facebook page
- Check one.network before travelling
A63 improvement scheme – St James Street to Market Place | 01-May-20 | 31-May-26 | Major A63 Improvement scheme – full infrastructure change. Lane and road closures until completion of scheme. | National Highways |
Air Street | 10-Apr-25 | 12-Apr-25 | Emergency water leak. Road closure in place. | Yorkshire Water |
Anlaby Road | 28-Mar-25 | 30-May-25 | Gas works. Bus lane closure from Hull Royal to the junction of Park Street/Icehouse Road. | Northern Gas Networks |
Ashcombe Road | 07-Apr-25 | 19-Apr-25 | Utility works at the junction of Barnes Way. Multi-way signals in place. | Independent Water Gas Transportation Electricity Network |
Barnes Way | 07-Apr-25 | 19-Apr-25 | Utility works from plot 24 to the new site entrance on Barnes Way. Multi-way signals in place. | Independent Water Gas Transportation Electricity Network |
Beverley Road | 17-Mar-25 | 11-Jul-25 | Gas works. Lane closure in place from number 53 to the junction of Margaret Street. | Northern Gas Networks |
Boulevard | 14-Apr-25 | 04-May-25 | Carriageway reconstruction and resurfacing from Hessle Road to Witty Street. Road closure in place. | Hull City Council |
Brook Street | 08-Apr-25 | 18-Apr-25 | Gas works. Lane closure in place. | Northern Gas Networks |
Clough Road | 07-Apr-25 | 16-Apr-25 | Excavate to locate faulted cable and repair. Lane closure at the side of Grove House. | Northern Powergrid |
Danube Road | 07-Apr-25 | 13-Jun-25 | Installing drainage connections for new Living With Water aquagreen. Also sewer works and the creation of a speed hump. Road closure in place. | Yorkshire Water |
Ennerdale | 21-Apr-25 | 06-May-25 | Install new cable at the rear of 11-13 Riverview Gardens. Multi-way signals in place. | Northern Powergrid |
Guildhall Road | 01-May-23 | 31-Oct-25 | Public realm works, including paving, surfacing, drainage, retaining walls and ducting within Queens Gardens and along Guildhall Road, Wilberforce Drive and Queens Dock Avenue. Lane closure on Guildhall Road. | Hull City Council |
Hawthorne Avenue | 26-Apr-25 | 26-Apr-25 | Annual Chalk Lane level crossing test. Two-way signals in place from one minute past midnight until 5am. | Network Rail |
Henry Boot Way | 14-Apr-25 | 18-Apr-25 | Utility asset works. Two-way signals in place. | ESP Electricity |
Humber Dock Street | 03-Feb-25 | 21-Oct-25 | Public realm works, road closure in place. Works are to take place on the public right of way along Humber Dock Street between junctions with Blanket Row and Humber Street. | Hull City Council |
Icehouse Road | 16-Apr-25 | 16-Apr-25 | Telecoms works at the junction with Anlaby Road. Road closure in place. | O2 |
Ilford Road | 04-Dec-24 | 17-Apr-25 | Constructing new manholes and connecting sewer pipework to allow for the connection of SUDS aqua greens, built off the highway back into the sewer system. Road closure on Ilford Road between Worcester Road and Bristol Road. | Yorkshire Water |
James Reckitt Avenue | 14-Apr-25 | 29-Apr-25 | Telecoms works. Two-way signals in place from 272 James Reckitt Avenue to the junction of Summergangs Road. | Grain |
Londesborough Street | 20-Apr-25 | 20-Apr-25 | Telecoms works. Multi-way signals and temporary crossing in place at the junction of Argyle Street. | MBNL |
Madeley Street | 17-Apr-25 | 18-Apr-25 | Lane closure to access manhole to desilt sewer network. | Yorkshire Water |
Marfleet Lane | 14-Apr-25 | 14-Apr-25 | Highway defect. Multi-way signals in place. | Yorkshire Water |
Margaret Street | 22-Apr-25 | 06-May-25 | Road closure due to works on Beverley Road. | Northern Gas Networks |
New Bridge Road | 07-Apr-25 | 22-Apr-25 | Telecoms works. Two-way signals in place. | MS3 |
Park Street | 14-Apr-25 | 14-Apr-25 | Excavate highway to replace manhole frame and cover. Two-way signals in place outside 43 Park Street. | Yorkshire Water |
Princes Avenue | 07-Apr-25 | 16-May-25 | Connection only due to works on Queens Road. Two-way signals in place. | Northern Gas Networks Hull City Council |
Queens Dock Avenue | 22-May-23 | 31-Oct-25 | Public realm works, Lane closure in place. | Hull City Council |
Queens Road | 07-Apr-25 | 16-May-25 | Essential gas works and carriageway resurfacing. Road closure at the junction of Queens Road and Princes Avenue. | Northern Gas Networks Hull City Council |
Riverview Gardens | 24-Feb-25 | 14-Apr-25 | New cable installation, multi-way signals in place. | Northern Powergrid |
Stalybridge Avenue | 07-Apr-25 | 14-Apr-25 | Locate main, install valve, and washout hydrant. Multi-way signals in place at the junction of Stalybridge Avenue and Annandale Road. | Yorkshire Water |
Stalybridge Avenue | 07-Apr-25 | 17-Apr-25 | Locate main, install valve, and washout hydrant. Road closure in place at the junction of Stalybridge Avenue. | Yorkshire Water |
Sutton Road | 24-Apr-25 | 25-Apr-25 | Utility works. Two-way signals in place. | O2 |
Wellington Lane | 14-Apr-25 | 02-May-25 | Road closure due to works on Beverley Road. | Northern Gas Networks |
Wiltshire Road | 08-Apr-25 | 14-Apr-25 | Repair burst water main outside RLM packing depot. Two-way signals in place. | Yorkshire Water |