Weekly roadworks update – 3 February

Close-up of a roadworks sign on a pavement

Hull becomes Hullywood again over the next couple of weeks as cameras begin rolling on an Apple TV production.

The details of the production are still being kept under wraps, but the filming will require some road closures at various times in the city’s Old Town.

The closures are as follows:

Road closures

  • Bowlalley Lane (full length)
    Friday 3 February (7am) to Tuesday 14 February (11.59pm)
  • Land Of Green Ginger (full length)
    Friday 3 February (7am) to Wednesday 8 February (11.59pm)
  • Silver Street (full length)
    Friday 3 February (7am) to Wednesday 8 February (11.59pm)
  • Bishop Lane (full length)
    Tuesday 7 February (00.01am) to Friday 10 February (11.59pm)
  • High Street (from Scale Lane Staith to Scale Lane)
    Tuesday 7 February (7am) to Monday 13 February (1pm)
  • Scale Lane (from Lion & Key to Eikona takeaway)
    Saturday 11 February (7am) to Monday 13 February (1pm)
  • Alfred Gelder Street (from Lowgate to Quay Street)
    Sunday 12 February (6am to 10am)

Reversal of one-way

  • Chapel Lane
    Tuesday 7 February (7am) to Monday 13 February (1pm)
[table id=73 /]